TENGE Production
Production plan
2020 : 140,000 tonnes / 1.0 MMbbl / 1.033.000 barrels
2021 : 234,000 tonnes / 1.7 MMbbl / 1.720.000 barrels
2022 : 316,000 tonnes / 2.3 MMbbl / 2.320.000 barrels
2023 : 375,000 tonnes / 2.7 MMbbl / 2.755.000 barrels
2024 : 433,000 tonnes / 3.1 MMbbl / 3.180.000 barrels
2025 : 481,000 tonnes / 3.5 MMbbl / 3.530.000 barrels
2026 : 528,000 tonnes / 3.8 MMbbl / 3.874.000 barrels
JUPITER Production
Production plan
Please note that in accordance with the project of trial production, each well can produces 50 tonnes / 345 barrels per day only (limited maximum). From 2020, after the starting of full value exploitation, production can be doubled at least ...
2018 2,000 tonnes / 90 Mbbl / 90,000 barrels
(maximum limited)
2019 38,000 tonnes / 284 Mbbl / 284,000 barrels
(forecast after 4 months):
2020 63,000 tonnes / 463 Mbbl / 463.000 barrels
2021 82,000 tonnes / 608 Mbbl / 608,000 barrels
2022 214,000 tonnes / 1,5 MMbbl / 1.573,000 barrels
2023 300,000 tonnes / 2,2 MMbbl / 2.194.000 barrels
2024 335,000 tonnes / 2,4 MMbbl / 2.456,000 barrels
KOROLEVSKOE Production
Production plan
2020 13,000 tonnes / 98 Mbbl / 98.000 barrels
2021 16,000 tonnes / 120 Mbbl / 120.000 barrels
2022 42,000 tonnes / 315 Mbbl / 315.000 barrels
2023 66,000 tonnes / 487 Mbbl / 487.000 barrels
2024 100,000 tonnes / 727 Mbbl / 727.000 barrels
2025 114,000 tonnes / 840 Mbbl / 840.000 barrels
2026 118,000 tonnes / 866 Mbbl / 866.000 barrels